본문 바로가기
모바일메뉴 열기/닫기
서울 정책아카이브에 오신것을 환영합니다.
한국어
English
简体中文
Français
Español
العربية
SEOUL
SOLUTION
로그인
회원가입
검색어
검색
서울주요정책
서울발전사
서울둘러보기
서울정책실
주요사업활동
정책공유사업
서울형 ODA
초청연수사업
우수정책시설견학
세계도시정보
주요도시 프로파일링
세계도시 정책동향
서울과 세계대도시
세계와 도시(계간지)
아카이브
새소식
자료실
소개
서울정책아카이브
서울시 국제협력과
서울국제개발협력단
파트너기관
홈
세계도시정보
세계도시 정책동향
[Waterworks] City Presentation – Jakarta(Indonesia)
등록일
2014-07-28
글쓴이
scaadmin
City Presentation - Jakarta(Indonesia) 1. www.pamjaya.go.id WATER SUPPLY SYSTEM IN JAKARTA 2. INDONESIA ARCHIPELAGO Source: Google Map, 2014 JAKARTA Bali 3. JAKARTA • Coordinates: 6° 12′ 0″ S, 106° 48′ 0″ E • Area Land : 662 km² Water: 6.998 km² • Population: 9.991.788 (Source: BPS Jakarta Dalam Angka 2013) 4. WATER RESOURCES IN JAKARTA Jakarta is passed by 13 major rivers. There are some reservoirs or lakes spread around of Jakarta area, but the most of resources can not be used as raw water for drinking water due to: •Most of rivers and reservoirs water quality is bad •Critical capacity, especially in dry season •Unstable continuity 5. RAW WATER RESOURCES FOR JAKARTA WATER SUPPLY 81% 3% 16% RAW WATER FROM JATILUHUR DAM RAW WATER FROM INTERNAL JAKARTA TREATED WATER FROM TANGERANG 6. PT. PAM LYONNAISE JAYA PT. AETRA Capacity : 9.025 lps Customer: 404.980 HC Capacity : 9.000 lps Customer: 398.621 HC West Tarum Canal (Raw Water) CDC Business Area II Business Area VI Cengkareng 75 lps Business Area I DCR 5 Cisadane 2.800 lps (Bulk Treated Water) Business Area IV Pejompongan 5600 lps Business Area V Cilandak 400 lps Buaran 5000 lps Business Area III 2013 Total Capacity : 18.025 lps 568,44 Mm3/year Total customer : 803.601 HC Service Coverage : 59,01% NRW : 41,47% EXISTING OF WATER SUPPLY SERVICE SYSTEM DCR 4 Pulogadung 4000 lps Ciliwung River 7. DISTRIBUTION OF WATER SUPPLY SYSTEM 8. EXISTING PIPE NETWORK Taman kota 200 lps Cengkareng 75 lps DCR 4 DCR 5 Pejompongan 1 & 2 5600 lps Buaran 5000 lps Pulo Gadung 4000 lps CDC Cisadane 2800 lps Cilandak 400 lps 9. WATER RESOURCES ADDITIONAL PLAN Total existing capacity of water production is 18.025 lps (2013) To Achieve MDG’S (68% coverage ratio in 2015) and Zero Deep Well, it require the additional supply about 8.000 lps – 10.000 lps. Additional supply plan (will be implemented in 2014 to 2016) is about 5.700 lps BTW supply reduction to 800 lps, stagging to 2022. 10. WATER SUPPLY DEVELOPMENT PLAN 11. CONSTRAINTS IN WATER SUPPLY DEVELOPMENT • Limited of availability of water resources caused service coverage and service level is not optimal. • The level of NRW is high (41,47%) • The Management of NRW Reduction is not optimal and comprehensive. • The condition of urban infrastructures is complex, the integrate of utility networks laying. • Development of new WTP, network development and networks arrangement require high investment. • Deep well consumption. • Exclusive Right of Private Partners 12. POLICIES IN WATER SUPPLY SYSTEM DEVELOPMENT • To develop any alternative study programs for increasing water security in Jakarta, either short term and long term, such a study of potential water resources in Jakarta area. • To encourage the implementation of additional raw water/treted water acceleration, either short term and long term • To provide a Master Plan of Water Supply Development for Jakarta. • To reduce the NRW level, either commersial losses and physical losses. • To increase the Service Coverage Ratio optimally and proportionally. • To develop services that meet the minimum service standards • To develop water supply for the Low-Income Communities area. • To do strict supervision of the implementation of cooperation to improve the performance, revenue, and to reduce the deficit cooperation projects. 13. THANK YOU Jakarta Water Supply Provincial Government Owned Company (PAM JAYA) JL. Penjernihan II- Pejompongan Jakarta Pusat 10210 Telepon : (021)5704250 Fax : (021)5711796 Http://www.pamjaya.co.id
City Presentation - Jakarta(Indonesia)
from
shrdcinfo
이전글
[Waterworks] City Presentation – Karthoum(Sudan)
다음글
[Waterworks] City Presentation – Rosenheim(Germany)
목록