Yeongdeungpo Arisu Water Purification Center

Overview
Overview

- Site Name: Yeongdeungpo Arisu Water Purification Center
- Year of installation: 08/31/1992 (1 integer), 30/09/2010 (2 integers)
- Location: Yeongdeungpo-gu, Seoul, nodule in 11 (yanghwadong)
- Scale: 600,000 ㎥ / day (1 integer 30, integer 25 2, membrane filtration 5)
- Organization: 6 opening (Yangcheon, phrases, Jiangxi, Eunpyeong, abrasion, Geumcheon)
Purpose
Purpose
-
To increase the number of water treatment facilities and raise the standard of treatment to produce healthier ARISU water for the public
Facilities
Facilities
|
The facility utilizes new technology in water filtration. A pressurized filtration membrane know as Saliva can separate and removefound in the water supply up to 0.1 ㎛. |
|
The standard of water treatment in this facilities ranges from mixing, flocculation, sedimenation and the filtration process. |
|
Advanced water treatment capabilities allow for an Ozone Treatment process to completely remove bad smells and taste to improve the overall quality of the water. |
Effects
Effects
-
Water is treated not only for safely but now processed for a great tasting product.
- Odorants are removed by an advanced water treatment process that have been difficult with previous standard treatment facilitates
- A steady supply of clean and great tasting ARISU water to citizens